Monday, August 10, 2009

preparing a site for installation of high pressured system

The ditch witch digging a trench for the irrigation pipe to lay down in.

Laying pipe down in a bed of sand. Wiring being taped underneath to prevent damage if pipe needs to be excavated.


Back filling with sand and then the excavated soil.

A schematic diagram of the circuit.

Positioning the solenoids to be connected to the control box at a later date.

Trench for a line along the production beds.

marking out the site for solenoid boxes.




isolating and marking out trenches and excavated holes to prevent injury, redirecting traffic along safer routes, restricting general public from entering work site.